Quality Control Under EU GMP Chapter 6: Sampling, Standards and Method Transfer

A quality control laboratory is only as reliable as its samples, its standards and the methods it inherits. Chapter 6 of the EU GMP Guide addresses all three.

Sampling

Chapter 6 requires sampling to follow approved written procedures describing the method, equipment, amount of sample, container type and storage conditions. Samples should be representative of the batch or material from which they are taken, and the sampling plan should be justified and based on a risk management approach. Containers must be labelled so that contents, batch number and sampling date are clear, and handled to prevent mix-ups. Reference and retention samples are covered separately in Annex 19.

Test records and raw data

Laboratory documentation should allow each test to be reconstructed. The guide lists what a test record should contain, including the material and batch, references to the specification and test procedures, results and calculations, test dates, equipment used, the initials of those who performed and verified the work, and a clear approval or rejection statement signed and dated by the responsible person. Raw data must be retained and readily available, and calculations critically examined.

Reference standards

Reference standards should be established as suitable for their intended use, with qualification and certification documented. Compendial standards from recognised sources are preferred as primary standards, and secondary or working standards are acceptable when traceability to a primary standard is demonstrated. Reagents and solutions need labelling with preparation, opening and expiry information as appropriate.

Analytical method transfer

The 2014 revision added requirements for transferring methods between sites or laboratories. Before transfer, the sending side should confirm that the methods comply with the marketing authorisation and review the original validation against current ICH or VICH requirements, with a gap analysis where needed. The transfer should follow a detailed protocol covering the tests, training, standards and samples, transport and storage conditions, and acceptance criteria. Any deviations from the protocol must be investigated before the transfer is closed, and the report should compare outcomes and identify any need for revalidation.

Why it matters

  • Method transfer failures are a frequent cause of unexpected OOS results at a new site.
  • Poorly controlled working standards undermine assay and impurity results.
  • Sampling procedures that are not risk-based are difficult to defend during inspections.

A short self-check

  • Is the sampling plan for each material justified by risk?
  • Is there a gap analysis on file for every transferred method?
  • Is traceability of working standards to primary standards documented?

How PQRA helps

PQRA helps laboratories and contract givers review sampling plans, method transfer protocols and reports, reference standard control and the alignment of test methods with the marketing authorisation. We can support transfers between sites and contract laboratories with proportionate documentation.

Contact PQRA to discuss how we can support your quality system.

CATEGORIES:

Uncategorized

Tags:

No responses yet

Leave a Reply

Your email address will not be published. Required fields are marked *