{"id":1349,"date":"2026-11-16T14:36:09","date_gmt":"2026-11-16T12:36:09","guid":{"rendered":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/"},"modified":"2026-11-16T14:38:28","modified_gmt":"2026-11-16T12:38:28","slug":"ectd-lifecycle-management-sequences-baselines-and-submission-gateways","status":"publish","type":"post","link":"https:\/\/www.pqra.gr\/el\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/","title":{"rendered":"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways"},"content":{"rendered":"<p style=\"font-size:19px;line-height:1.7;color:#33414d;\"><strong>An eCTD dossier is not a single submission but a lifecycle of sequences that builds over the years a product is on the market. Managing that lifecycle well keeps the current view of the dossier accurate for both the applicant and the authority, and it is about to become more important with the transition to eCTD v4.0.<\/strong><\/p>\n<h2>Sequences and lifecycle operations<\/h2><p>Every eCTD submission is a numbered sequence, starting with the initial application. In eCTD v3.2.2, each document carries a lifecycle operation that tells the reviewer how it relates to earlier content:<\/p><ul><li><strong>new<\/strong> &#8211; a document not previously submitted;<\/li><li><strong>replace<\/strong> &#8211; a document that supersedes an earlier version;<\/li><li><strong>append<\/strong> &#8211; additional information to an existing document;<\/li><li><strong>delete<\/strong> &#8211; a document that is no longer relevant.<\/li><\/ul><p>Incorrect operations are a frequent cause of a confusing current view, for instance when an updated specification is submitted as new instead of replacing the old one, leaving two versions apparently valid.<\/p><h2>Baseline submissions<\/h2><p>Older products may still have dossiers that originated on paper or in non-eCTD electronic formats. A baseline submission reformats the currently approved content into eCTD without changing it, giving a clean starting point for future lifecycle. CMDh and EMA guidance describe how baselines should be declared and what they may and may not contain; no new data should be introduced under a baseline.<\/p><h2>Getting the dossier to the authority<\/h2><ul><li>For the centralised procedure, eCTD submissions are sent to EMA through the eSubmission Gateway or Web Client.<\/li><li>For mutual recognition, decentralised and national procedures, the Common European Submission Platform (CESP) is widely used to reach national competent authorities, including EOF.<\/li><\/ul><p>Each sequence must pass technical validation against the EU eCTD validation criteria before it is accepted for review.<\/p><h2>The move to eCTD v4.0<\/h2><p>EMA has opened eCTD v4.0 for new centralised marketing authorisation applications on a voluntary basis since December 2025. Under its published roadmap, v4.0 is expected to become strongly recommended for new centralised applications from early 2027 and mandatory from early 2028, with separate arrangements for transitioning existing v3.2.2 lifecycles. Version 4.0 changes how documents are identified and reused, so lifecycle discipline now will make migration simpler.<\/p><h2>How PQRA helps<\/h2><p>PQRA manages eCTD lifecycles, prepares baseline submissions, performs pre-submission technical validation and handles transmission through CESP and the EMA gateway.<\/p><p><a href=\"\/el\/contact\/\">Contact PQRA<\/a> to discuss your next dossier.<\/p>","protected":false},"excerpt":{"rendered":"<p>An eCTD dossier is not a single submission but a lifecycle of sequences that builds over the years a product is on the market. Managing that lifecycle well keeps the current view of the dossier accurate for both the applicant and the authority, and it is about to become more important with the transition to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1368,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"saved_in_kubio":false,"_swpsp_post_exclude":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1349","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways - PQRA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pqra.gr\/el\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways - PQRA\" \/>\n<meta property=\"og:description\" content=\"An eCTD dossier is not a single submission but a lifecycle of sequences that builds over the years a product is on the market. Managing that lifecycle well keeps the current view of the dossier accurate for both the applicant and the authority, and it is about to become more important with the transition to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pqra.gr\/el\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/\" \/>\n<meta property=\"og:site_name\" content=\"PQRA\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-16T12:36:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-16T12:38:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/11\/ectd-lifecycle-management.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 \u03bb\u03b5\u03c0\u03c4\u03ac\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/person\\\/31e1a03125e7281efaddd7278681af2c\"},\"headline\":\"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways\",\"datePublished\":\"2026-11-16T12:36:09+00:00\",\"dateModified\":\"2026-11-16T12:38:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/\"},\"wordCount\":387,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ectd-lifecycle-management.png\",\"articleSection\":[\"Uncategorized\"],\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/\",\"name\":\"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways - PQRA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ectd-lifecycle-management.png\",\"datePublished\":\"2026-11-16T12:36:09+00:00\",\"dateModified\":\"2026-11-16T12:38:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ectd-lifecycle-management.png\",\"contentUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/ectd-lifecycle-management.png\",\"width\":1200,\"height\":630},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pqra.gr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#website\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/\",\"name\":\"PQRA\",\"description\":\"Your trusted partner in Pharma\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pqra.gr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#organization\",\"name\":\"PQRA\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/pqra-logo-white.png\",\"contentUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/pqra-logo-white.png\",\"width\":594,\"height\":362,\"caption\":\"PQRA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/person\\\/31e1a03125e7281efaddd7278681af2c\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.pqra.gr\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways - PQRA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pqra.gr\/el\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/","og_locale":"el_GR","og_type":"article","og_title":"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways - PQRA","og_description":"An eCTD dossier is not a single submission but a lifecycle of sequences that builds over the years a product is on the market. Managing that lifecycle well keeps the current view of the dossier accurate for both the applicant and the authority, and it is about to become more important with the transition to [&hellip;]","og_url":"https:\/\/www.pqra.gr\/el\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/","og_site_name":"PQRA","article_published_time":"2026-11-16T12:36:09+00:00","article_modified_time":"2026-11-16T12:38:28+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/11\/ectd-lifecycle-management.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"admin","\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"2 \u03bb\u03b5\u03c0\u03c4\u03ac"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#article","isPartOf":{"@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/"},"author":{"name":"admin","@id":"https:\/\/www.pqra.gr\/#\/schema\/person\/31e1a03125e7281efaddd7278681af2c"},"headline":"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways","datePublished":"2026-11-16T12:36:09+00:00","dateModified":"2026-11-16T12:38:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/"},"wordCount":387,"commentCount":0,"publisher":{"@id":"https:\/\/www.pqra.gr\/#organization"},"image":{"@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/11\/ectd-lifecycle-management.png","articleSection":["Uncategorized"],"inLanguage":"el","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/","url":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/","name":"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways - PQRA","isPartOf":{"@id":"https:\/\/www.pqra.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#primaryimage"},"image":{"@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/11\/ectd-lifecycle-management.png","datePublished":"2026-11-16T12:36:09+00:00","dateModified":"2026-11-16T12:38:28+00:00","breadcrumb":{"@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#primaryimage","url":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/11\/ectd-lifecycle-management.png","contentUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/11\/ectd-lifecycle-management.png","width":1200,"height":630},{"@type":"BreadcrumbList","@id":"https:\/\/www.pqra.gr\/ectd-lifecycle-management-sequences-baselines-and-submission-gateways\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pqra.gr\/"},{"@type":"ListItem","position":2,"name":"eCTD Lifecycle Management: Sequences, Baselines and Submission Gateways"}]},{"@type":"WebSite","@id":"https:\/\/www.pqra.gr\/#website","url":"https:\/\/www.pqra.gr\/","name":"PQRA","description":"Your trusted partner in Pharma","publisher":{"@id":"https:\/\/www.pqra.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pqra.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/www.pqra.gr\/#organization","name":"PQRA","url":"https:\/\/www.pqra.gr\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.pqra.gr\/#\/schema\/logo\/image\/","url":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/07\/pqra-logo-white.png","contentUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/07\/pqra-logo-white.png","width":594,"height":362,"caption":"PQRA"},"image":{"@id":"https:\/\/www.pqra.gr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.pqra.gr\/#\/schema\/person\/31e1a03125e7281efaddd7278681af2c","name":"admin","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.pqra.gr"]}]}},"_links":{"self":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts\/1349","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/comments?post=1349"}],"version-history":[{"count":1,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts\/1349\/revisions"}],"predecessor-version":[{"id":1369,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts\/1349\/revisions\/1369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/media\/1368"}],"wp:attachment":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/media?parent=1349"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/categories?post=1349"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/tags?post=1349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}