{"id":939,"date":"2026-10-26T10:18:00","date_gmt":"2026-10-26T08:18:00","guid":{"rendered":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/"},"modified":"2026-10-26T10:33:06","modified_gmt":"2026-10-26T08:33:06","slug":"the-validation-plan-and-summary-report-what-each-document-must-actually-say","status":"publish","type":"post","link":"https:\/\/www.pqra.gr\/el\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/","title":{"rendered":"The Validation Plan and Summary Report: What Each Document Must Actually Say"},"content":{"rendered":"<p style=\"font-size:19px;line-height:1.7;color:#33414d;\"><strong>A validation plan sets out, before work starts, how a system will be shown to be fit for its intended use; the summary report closes the loop by stating whether that was achieved. Between them they are the first documents an inspector opens.<\/strong><\/p><h2>What belongs in the validation plan<\/h2><ul><li>Scope: the system, its version, the GxP processes it supports and the boundaries with interfaced systems.<\/li><li>Roles and responsibilities, including the process owner, system owner, quality unit and any supplier.<\/li><li>The lifecycle approach and the deliverables planned, justified by the risk assessment.<\/li><li>Acceptance criteria and the rules for handling deviations and failed tests.<\/li><li>Reliance on supplier documentation and testing, and how it will be assessed.<\/li><li>Requirements for operational procedures, training, backup and restore, security and business continuity before go-live.<\/li><\/ul><p>Annex 11 expects validation documentation to cover the relevant lifecycle steps, with standards, protocols and acceptance criteria justified by risk assessment. The plan is where that justification is recorded.<\/p><h2>Keep the plan proportionate<\/h2><p>A plan for a configurable enterprise system differs from one for a standalone instrument. Copying a thirty-page template for every project hides the decisions that matter. State what you will do, what you will not do, and why. That reasoning is what shows critical thinking, and it is far easier to defend than silence.<\/p><h2>What the summary report must conclude<\/h2><p>The report is not a list of documents. It should confirm that the plan was followed, summarise test results, and list every deviation with its resolution and impact. Open items, workarounds and known limitations need explicit risk acceptance, with owners and dates for any outstanding actions.<\/p><ul><li>A clear statement on whether the system is released for GxP use.<\/li><li>Traceability to the requirements and risk assessment.<\/li><li>Confirmation that procedures and training are in place.<\/li><li>Reference to the plan for any approved departures from it.<\/li><\/ul><h2>Common weaknesses<\/h2><p>Inspectors frequently see plans approved after testing began, reports that gloss over failed tests, and conclusions that ignore unresolved deviations. Sequence matters: the plan should be approved before execution, and the report should be signed only when every open point has been dispositioned.<\/p><h2>Who signs, and when<\/h2><p>Approval signatures tell the reader who accepted responsibility. The process owner should approve because the system supports their process, and quality should approve to confirm compliance with the quality system. Where a supplier performs part of the work, the plan should say which deliverables are the supplier&#8217;s and how they will be reviewed. For systems that go through repeated releases, consider a master validation plan with short release-level addenda, so each release is documented consistently without reproducing the whole plan every time.<\/p><h2>How PQRA helps<\/h2><p>PQRA can draft or review validation plans and summary reports, build proportionate templates for your quality system, and check that the conclusions are supported by the underlying evidence.<\/p><p><a href=\"\/el\/contact\/\"><strong>Contact PQRA<\/strong><\/a> to discuss how we can support your computerised system validation programme.<\/p>","protected":false},"excerpt":{"rendered":"<p>A validation plan sets out, before work starts, how a system will be shown to be fit for its intended use; the summary report closes the loop by stating whether that was achieved. Between them they are the first documents an inspector opens. What belongs in the validation plan Scope: the system, its version, the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1097,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"saved_in_kubio":false,"_swpsp_post_exclude":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-939","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Validation Plan and Summary Report: What Each Document Must Actually Say - PQRA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pqra.gr\/el\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Validation Plan and Summary Report: What Each Document Must Actually Say - PQRA\" \/>\n<meta property=\"og:description\" content=\"A validation plan sets out, before work starts, how a system will be shown to be fit for its intended use; the summary report closes the loop by stating whether that was achieved. Between them they are the first documents an inspector opens. What belongs in the validation plan Scope: the system, its version, the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pqra.gr\/el\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/\" \/>\n<meta property=\"og:site_name\" content=\"PQRA\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T08:18:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T08:33:06+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 \u03bb\u03b5\u03c0\u03c4\u03ac\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/person\\\/31e1a03125e7281efaddd7278681af2c\"},\"headline\":\"The Validation Plan and Summary Report: What Each Document Must Actually Say\",\"datePublished\":\"2026-10-26T08:18:00+00:00\",\"dateModified\":\"2026-10-26T08:33:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/\"},\"wordCount\":491,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/validation-plan-and-summary-report.png\",\"articleSection\":[\"Uncategorized\"],\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/\",\"name\":\"The Validation Plan and Summary Report: What Each Document Must Actually Say - PQRA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/validation-plan-and-summary-report.png\",\"datePublished\":\"2026-10-26T08:18:00+00:00\",\"dateModified\":\"2026-10-26T08:33:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/validation-plan-and-summary-report.png\",\"contentUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/validation-plan-and-summary-report.png\",\"width\":1200,\"height\":630},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pqra.gr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Validation Plan and Summary Report: What Each Document Must Actually Say\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#website\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/\",\"name\":\"PQRA\",\"description\":\"Your trusted partner in Pharma\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pqra.gr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#organization\",\"name\":\"PQRA\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/pqra-logo-white.png\",\"contentUrl\":\"https:\\\/\\\/www.pqra.gr\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/pqra-logo-white.png\",\"width\":594,\"height\":362,\"caption\":\"PQRA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pqra.gr\\\/#\\\/schema\\\/person\\\/31e1a03125e7281efaddd7278681af2c\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.pqra.gr\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Validation Plan and Summary Report: What Each Document Must Actually Say - PQRA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pqra.gr\/el\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/","og_locale":"el_GR","og_type":"article","og_title":"The Validation Plan and Summary Report: What Each Document Must Actually Say - PQRA","og_description":"A validation plan sets out, before work starts, how a system will be shown to be fit for its intended use; the summary report closes the loop by stating whether that was achieved. Between them they are the first documents an inspector opens. What belongs in the validation plan Scope: the system, its version, the [&hellip;]","og_url":"https:\/\/www.pqra.gr\/el\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/","og_site_name":"PQRA","article_published_time":"2026-10-26T08:18:00+00:00","article_modified_time":"2026-10-26T08:33:06+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"\u03a3\u03c5\u03bd\u03c4\u03ac\u03c7\u03b8\u03b7\u03ba\u03b5 \u03b1\u03c0\u03cc":"admin","\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"2 \u03bb\u03b5\u03c0\u03c4\u03ac"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#article","isPartOf":{"@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/"},"author":{"name":"admin","@id":"https:\/\/www.pqra.gr\/#\/schema\/person\/31e1a03125e7281efaddd7278681af2c"},"headline":"The Validation Plan and Summary Report: What Each Document Must Actually Say","datePublished":"2026-10-26T08:18:00+00:00","dateModified":"2026-10-26T08:33:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/"},"wordCount":491,"commentCount":0,"publisher":{"@id":"https:\/\/www.pqra.gr\/#organization"},"image":{"@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/10\/validation-plan-and-summary-report.png","articleSection":["Uncategorized"],"inLanguage":"el","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/","url":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/","name":"The Validation Plan and Summary Report: What Each Document Must Actually Say - PQRA","isPartOf":{"@id":"https:\/\/www.pqra.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#primaryimage"},"image":{"@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/10\/validation-plan-and-summary-report.png","datePublished":"2026-10-26T08:18:00+00:00","dateModified":"2026-10-26T08:33:06+00:00","breadcrumb":{"@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#primaryimage","url":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/10\/validation-plan-and-summary-report.png","contentUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/10\/validation-plan-and-summary-report.png","width":1200,"height":630},{"@type":"BreadcrumbList","@id":"https:\/\/www.pqra.gr\/the-validation-plan-and-summary-report-what-each-document-must-actually-say\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pqra.gr\/"},{"@type":"ListItem","position":2,"name":"The Validation Plan and Summary Report: What Each Document Must Actually Say"}]},{"@type":"WebSite","@id":"https:\/\/www.pqra.gr\/#website","url":"https:\/\/www.pqra.gr\/","name":"PQRA","description":"Your trusted partner in Pharma","publisher":{"@id":"https:\/\/www.pqra.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pqra.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/www.pqra.gr\/#organization","name":"PQRA","url":"https:\/\/www.pqra.gr\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.pqra.gr\/#\/schema\/logo\/image\/","url":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/07\/pqra-logo-white.png","contentUrl":"https:\/\/www.pqra.gr\/wp-content\/uploads\/2026\/07\/pqra-logo-white.png","width":594,"height":362,"caption":"PQRA"},"image":{"@id":"https:\/\/www.pqra.gr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.pqra.gr\/#\/schema\/person\/31e1a03125e7281efaddd7278681af2c","name":"admin","image":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/secure.gravatar.com\/avatar\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/656b750ec6bc02db9de84dc3080e82be722c7777ef23ff04d6e8e7a0ac541a45?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.pqra.gr"]}]}},"_links":{"self":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts\/939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/comments?post=939"}],"version-history":[{"count":1,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts\/939\/revisions"}],"predecessor-version":[{"id":1101,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/posts\/939\/revisions\/1101"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/media\/1097"}],"wp:attachment":[{"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/media?parent=939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/categories?post=939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pqra.gr\/el\/wp-json\/wp\/v2\/tags?post=939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}