GMP for Investigational Medicinal Products: Quality Rules for the Clinical Trial Supply Chain

Investigational medicinal products are made in small batches, often blinded, with processes that are still being developed and are rarely fully validated. That is why they have their own GMP framework. Since the Clinical Trials Regulation fully replaced the old directive, sponsors and manufacturers have worked under a dedicated delegated regulation and Commission guideline. Both are worth revisiting as trials grow more complex.

The legal framework

  • Regulation (EU) No 536/2014, the Clinical Trials Regulation, has applied since 31 January 2022. Its transition period ended on 31 January 2025, and all ongoing trials had to be moved to CTIS by then.
  • Commission Delegated Regulation (EU) 2017/1569 sets the GMP principles for investigational products, covering the pharmaceutical quality system, production, quality control, samples, complaints, recalls and emergency unblinding.
  • The Commission detailed guideline on GMP for investigational medicinal products (2017) explains how these principles apply in practice. It replaced the former Annex 13.

Key requirements

  • Product specification file. It must exist before the first batch and be kept up to date as the product develops.
  • Retention. The product specification file and batch documentation are kept for at least five years after completion of the last trial in which the batch was used. Samples are kept for at least two years after the last trial.
  • Blinding and randomisation. Packaging operations must protect the blind, with controlled randomisation codes and a reliable emergency code-break system.
  • Comparators. Repackaging a marketed comparator requires care: the retest or use-by date cannot go beyond the original expiry date, and reference samples are taken.
  • Labelling. Labels must follow Annex VI of the Clinical Trials Regulation. Updating the expiry date requires an extra label, a second-person check, line clearance and reconciliation.
  • QP certification. No batch may be released for a trial before a Qualified Person certifies it. For products made outside the EU, the QP must be satisfied that GMP standards are at least equivalent, usually through an audit.
  • Returns and destruction. Returned products are stored separately under control. Destruction requires the sponsor’s written authorisation and full reconciliation, and must be documented with a certificate.

Where inspections find problems

Common weak points include product specification files that lag behind the clinical protocol, weak control of randomisation and labelling changes, missing technical agreements between sponsor, manufacturer and distributor, and poor reconciliation of returned products. Temperature control during distribution to sites is another frequent issue.

Keeping up with change

EU proposals under discussion would change aspects of the clinical trials framework, including the supply of investigational products directly to patients. Sponsors running decentralised elements should follow these developments and make sure their supply chain remains under GMP and GDP control.

How PQRA helps

PQRA supports sponsors and manufacturers of investigational products with GMP gap assessments, product specification file reviews, supplier and site audits, QP-related documentation and inspection readiness for the clinical supply chain.

Running clinical trials in Greece or the EU? Contact PQRA about your IMP quality system.

CATEGORIES:

Uncategorized

Tags:

No responses yet

Leave a Reply

Your email address will not be published. Required fields are marked *